United States Dedicates New Embassy Compound in Addis Ababa, Ethiopia

Read Time:1 Minute, 48 Second

From, U.S. Department of State: In an important symbol of America’s commitment to an enduring friendship with Ethiopia, as well as our bilateral relationships with the Government of Ethiopia and the African Union, Deputy Secretary of State James B. Steinberg dedicated the new U.S. Embassy facility in Ethiopia today. Ethiopian Deputy Prime Minister and Foreign Minister Hailemariam Desalegn and African Union Deputy Chairman Erastus Mwencha attended the ribbon cutting ceremony, as well as Deputy Director of the Bureau of Overseas Buildings Operations, Lydia Muniz; U.S. Ambassador to Ethiopia, Donald E. Booth; and U.S. Ambassador to the African Union, Michael E. Battle.

The dedication of the New Embassy Compound (NEC) in Addis Ababa marks the 77th diplomatic facility to be completed by the Bureau of Overseas Buildings Operations (OBO) since the 1999 enactment of the Secure Embassy Construction and Counterterrorism Act. In the last twelve years, OBO has moved more than 22,000 people into safer facilities. OBO has built 30 new facilities in Africa and has an additional seven projects in design or construction on the continent.

The New Embassy Compound, located just below Entoto Mountain and overlooking Addis Ababa, was designed to maintain much of the plant and wildlife that has existed on the site for many years. The building design integrates green building techniques and was one of the first Leadership in Energy and Environmental Design (LEED®) registered facilities in Ethiopia.

The multi-building complex provides more than approximately 1,000 U.S. embassy direct hire and locally employed staff, including the U.S. Mission to the African Union, with more than 19,000 square meters of working space.

B.L. Harbert International of Birmingham, Alabama, under a design/build contract, constructed the NEC; the architectural firm of Page Southerland Page of Arlington, Virginia designed the facility. The total approximate cost of the project, which generated jobs in both the United States and Ethiopia, is $157 million. The new facility was completed in August 2010, with, at times, more than 1,200 workers involved in the construction.

For further information, please contact Christine Foushee at FousheeCT@state.gov

or (703) 875-5751.

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *

Previous post Alfa Demmellash: Transforming Lives and Communities Through Entrepreneurship
Next post Obama to Mubarak: Time for change